OCA BWAS_Centered CCR (2)

Feb. 2011 Update

Now, we are moving along into 2011, close to two years on this project. I got some pictures of the firewall metal work that was completed. I thought this was an incredible fabrication to the car.

Meanwhile, while they are doing this, we are still waiting to find a painter who can repaint the car properly. I also elected not to use the gentleman out of Pennsylvania to do the canvas work on the top and possibly the interior. I just didn’t get the warm and fuzzy with him after our meeting.

IMG_1578
Evaporator opening being prepped so that it can be closed up.
Firewall_patches2_Done
Openings all patched up and ready.
Project 442
Completed patch, painted and hoses connected.

 

Leave a Reply

Your email address will not be published. Required fields are marked *